Yesterday, I drove up to the cabin and completed the concrete slab project by stripping the forms and backfilling the edges with soil. The finish on the concrete is lovely. Desiree did a great job on the surface, and there are no rock pockets along the sides.
As
much as I like rocks, they are not useful when they form air pockets within
concrete.
Before
driving back home, I misted the slab with water to encourage a slow curing
process, which produces stronger concrete. Although the sacks of premix say you
can walk on the pour after 24 hours, I have yet to take a single step on it.
Maybe Des can take the "maiden step" the next time we go to the
cabin.
The
Slab After Stripping the Forms
Backfilled
Slab
—Mitchell
Hegman


No comments:
Post a Comment